Skip to main content

Sub Saharan Africa International Petroleum Exhibition and Conference   

Eko Convention Center, Lagos, Nigeria
10-13 February 2025

PETAN Logo

29 Jan 2024

TPT Crude Evacuation Project

TPT Shipbrokers Int. Limited Stand: P15

This entailed our storage vessel loading 50,000 bpd and discharging into five shuttle vessels. Subsequently, these shuttles transported the crude to An FPSO Bryanston with a 500,000-barrel capacity located at Sanbarth, culminating in the transportation of the crude to an offshore Single Buoy Mooring (SBM) for the ultimate discharge.

We also evacuated crude at Bonny, creating a solution store of 50,000 bpd of crude from shallow water with a draft restriction of 6 meters. Our vessel Chapel loads from the production facility and discharges into the 5-shuttle vessel running concurrently which goes upriver and out to sea transporting the crude into the FPSO BRYANSTON located at Sanbarth

View all Exhibitor Videos
Loading